Chamartín Station is a major transport hub that serves commuter trains as well as medium and long distance trains. It is one of the main connection stations in Madrid, offering national and international connections, including high-speed trains (AVE) connecting Madrid with other Spanish cities and the connection to Barajas airport.

Madrid
Location
ADIF
Client
Construction
Contract type
2019-2026
Execution Period
Azvi

Description of the works

Remodelling of the tracks and platforms in the conventional gauge area of Chamartín Clara Campoamor station (tracks 1 to 14 in the southern concourses, northern concourse and the area between platforms) and the refurbishment of the old lower concourse with connections to platforms 1 to 7 and Metro de Madrid, including escalators and lifts. 

These works, completed in 2023, have enabled the recovery of the old station concourse dating from the 1970s and abandoned for more than 30 years, making direct connection between the Suburban, High Speed and Metro networks possible, speeding up access and transfers for users. 

This work has been key to ensuring the execution phases of the Chamartín Station extension and transformation project.

Main actions

The contract covers a number of essential activities:

Demolition

  • Lifting of the track 6 km.
  • Quarry sub-ballast, 17,195 m³.

Superstructure

  • Tracks on ballast. 
  • Tracks on slabs between platforms. 

Structure

  • Construction of an overpass for the Technical Treatment Centre.
  • Extension of the old vestibule to two more tracks and connection with the “T-Roja” gallery by means of piles and reinforced slab.
  • Construction of a maintenance building including workshop, warehouse and an administrative building with changing rooms.

Azvi
Azvi

Electrification

  • Assembly of 48.5 km of new CA-160 general track catenary.
  • Control of new motors for disconnectors and upgrade of those that move and dismantle.
  • Implementation of a peripheral platform remote control system including safety, signalling and communication: modification of the software and hardware of the conventional electronic interlocking (ALSTOM) for high-speed lines, with a corresponding local video control system. Modification of interconnections with collateral stations.
  • Modification of the CTT’s interlocking software and hardware.
  • Extension/modification of the existing Train Protection System.
  • Remote control of security installations.
  • New medium voltage connection to the station.

Related projects