Skip links

Madrid-Burgos-Vitoria HSR

2
SECTIONS
34.3
KILOMETERS
1
GAUGE CHANGER
€65.8 M
BUDGET

The Madrid-Burgos-Vitoria high-speed railway line was built to give continuity to the Madrid-Segovia-Valladolid corridor. Azvi carried out the execution of two stretches.

El Almendro Tunnel | Azvi

Description

The works consisted of the track formation construction.

Structures that should be mentioned are the Almendro tunnel (840 m long) and the Arroyo de Prado viaduct (74 m long).

The works included:

  • Estépar-Burgos station Section.
  • Nudo Venta de los Baños-Torquemada.
  • Burgos station gauge changer.

Related Projects

Explorar
Mover