Skip links

HSRL Zaragoza-Pamplona 

1
SECTION
10.3
KM
€24.3
MILLION

The Zaragoza-Pamplona-Basque Y high-speed railway line is integrated into the development of the Cantabrian-Mediterranean Corridor and has been designed for a high-speed double track. 

Azvi

Peralta – Olite section

This section is 10.3 km long and runs through the municipalities of Peralta, Marcilla, Falces and Olite in Navarra. 

Azvi has constructed the railway platform as well as all the infrastructure works necessary for the proper functioning of line including the execution of the earthworks, drains, structures, railway installations of the platform, repositioning of the rights of ways and effects to public services, complementary works as well as the corrective measures of its environmental impact, among others. 

Among the unique structures and installations included along its route are three overpasses, four underpasses, twenty-seven cross drainage works (which also serve as animal crossings), a specific animal crossing and a crossover switch to give greater operability to the line. 

Related projects

Proyectos relacionados

Explorar
Mover