Madrid-Barcelona-French Border
High-Speed Railway
Section: Sant Celoni-Riells

7.57 km
LENGTH
315 km/h
MAX. SPEED
High-speed railway construction connecting France through an a rea of high environmental
value, demonstrating Azvi’s railway specialisation and experience in international projects.

The project is located within the high-speed raíl corridor of the Madrid-Barcelona-French border, linking the lberian Península with Europe and enabling the connection of the Spanish high-speed network with France since 2013. The section between Barcelona and the French border covers 165 km, reducing travel time from approximately three hours to less than an hour.

€48,81 M
BUDGET
Barcelona
Location
ADIF
Client
Construction
Contract type
2003-2008
Construction period
Azvi

Description of works:

At Azvi, we have successfully constructed a 7.5 km section of high-speed railway line, designed for speeds of up to 315 km/h. In addition to excavations and embankments, three imposing viaducts, a tunnel andan artificial tunnel were constructed, demonstrating Azvi’s experience and expertise in state-of-the-art railway construction.

Key figures

1,321,000 m³
Excavations
64,662 m³
Subgrade
28,451 m³
Sub-ballast
587,000 m³
Embankment
15.607 m
Ditches
6,398 m²
Total slabs area
Viaduct and tunnel construction
Tunnel construction

Main Challenges

Pertegas Viaduct

Azvi faced the challenge of minimising the environmental impact ofthis structure by constructing a single-span viaduct that rises majestically over the river. With a total length of 186 m and 5 spans, this viaduct stands out far its hyper static design, with two prefabricated trough beams 2.55 m deep and prestressed compression slabs.

Sustainability

At Azvi, we are proud to highlight our commitment to sustainability and the preservation of the environment. The Barcelona-Figueres line crosses areas of great environmental value, including the Montseny and Montnegre – Corredor Natural Parks. The design included important measures to minimize the environmental impact, such as the construction of three large special tunnels to guarantee the passage of wildlife.

In addition, Azvi carried out complementary measures such as the conditioning of slopes, the creation of landfills, the planting of shrubs and trees, and the protection of hydrological systems, fauna and the acoustic environment. Azvi also carried out additional work to replace and rehabilitate access roads and paths to improve the existing infrastructure.