Skip links

Madrid-Burgos-Vitoria HSR

2
SECTIONS
34.3
KILOMETERS
1
GAUGE CHANGER
€65.8 M
BUDGET

The Madrid-Burgos-Vitoria high-speed railway line was built to give continuity to the Madrid-Segovia-Valladolid corridor. Azvi carried out the execution of two stretches.

El Almendro Tunnel | Azvi

Description

The works consisted of the track formation construction.

Structures that should be mentioned are the Almendro tunnel (840 m long) and the Arroyo de Prado viaduct (74 m long).

The works included:

  • Estépar-Burgos station Section.
  • Nudo Venta de los Baños-Torquemada.
  • Burgos station gauge changer.

Related Projects

Explorar
Mover
Azvi
COOKIE SETTINGS

This website uses cookies so that we can provide you with the best possible user experience. Cookie information is stored in your browser and performs functions such as recognising you when you return to our site or helping our team understand which parts of the site you find most interesting and useful.