The Morelia Road Bypass project involves the construction of a new 63.1 km, two-lane A2-class road running from km 0+500.00 on the Mexico–Guadalajara motorway to km 58+136.83 on the Pátzcuaro–Uruapan motorway. The project includes three structures, the most notable of which is the El Nispo Viaduct. Measuring 316.94 m in length, the viaduct has a maximum pier height of 52.18 m. The structure consists of 42 post-tensioned girders and its construction will require 145,656 kg of prestressing steel, 1,666,208 kg of structural steel and 9,798 m³ of concrete. The El Nispo Viaduct is a strategic infrastructure component of the Morelia Bypass, designed to improve connectivity, ease traffic flow and reduce journey times. Its construction contributes to the economic and logistics development of Michoacán through an engineering solution that overcomes significant topographical challenges and strengthens the region’s road infrastructure. El Nispo Road Viaduct
Azvi | Construcciones Urales

Advantages and Benefits
Technical Complexity of the Works
The viaduct, with a length of 316.94 m and a maximum pier height of 52.18 m, enables the road alignment to cross terrain requiring specialised structural solutions.
The use of 42 post-tensioned girders enables the construction of a structure designed to meet the strength and durability requirements of road infrastructure.
The viaduct will improve traffic conditions for heavy goods vehicles and facilitates the continuity of road freight operations. Azvi | Construcciones Urales

Related projects
320 m
LENGTH
Mexico
COUNTRY
SICT Mexico
CLIENT