The aim of this project is to provide the municipality with new supply sources, integrating it into Malaga’s network to a guarantee better service.

50,8 M€
Presupuesto
2008 - 2011
Plazo ejecución
10.000 m³
Main tank capacity
4.000 m³
Secondary tank capacity
km 2.7
Length of pipeline
Azvi

Aim

The project provides the municipality of Alhaurín de la Torre with new, improved water supply sources. The area will be integrated into Malaga’s network, ensuring a better service.

Key elements of the project

  • Construction of a 10,000 m³ tank to regulate the flow of water supply from the Malaga network. A pipeline runs from this tank to a second, newly built 4,000m3 water distribution tank.
  • A 2.7km long, 400mm diameter, ductile cast iron pipeline.
  • A pumping station equipped with all the necessary safety measures, is designed to pump the necessary flow to the main Tomillares tank.
  • Installation of a remote-controlled system to fill the tanks and operate the pumping station with complete safety.