Palo Alto Wind Farm

116
VIVIENDAS
Mexico
COUNTRY
€16.9
MILLION

Azvi was responsible for the civil works for the installation of the wind turbines: foundations and assembly platforms; access and circulation roads; and drainage works and trenches for the installation of the network cabling.

50,8 M€
Presupuesto
Jalisco
Location
43
Wind turbines
2
Meteorological towers
km 27.2
Access and connection routes
Enel Green Power
Client
Azvi

Description of works

Provision of civil works services, including the construction of:

  • Main road and access roads.
  • Platforms for wind turbine assembly.
  • Trenches.
  • Wind turbine foundations.
  • Installation of fibre optics, medium voltage and grounding system.