Interesting works recently completed or under construction:
Fuengirola (Málaga) maritime walk remodeling.
1.500 m in length and 25 m of average width. The most relevant figures are 32.407 m2 of sidewalk, 11.004 m2 carriageway, 3.578 m2 of parking and 12 pergolas to access to the beach.
Sewage plants at Elche de la Sierra, Molinicos, Socovos, Yeste, Letur and Nerpio (Albacete).
Construction, maintenance an operation of sewage plants. 6 stations of the type of processing of prolonged aireation.
Sewage plants at Ossa de Montiel, Munuera and El Bonillo (Albacete).
Construction, maintenance an operation of sewage plants. 3 stations of the type of processing of prolonged aireation, for a flow rate of 2.382 m3/day.
Sewage plant at Bailén (Jaén).
For a flow rate of 226 m3/h.
Rainwater Pumping Station (EBAP) in Los Remedios (Sevilla). Third Phase.
For a flow rate of 12.000 l/sec., a mechanical facility consisting on a 7 T-capacity gantry crane, 13,50 m span and installation of high-voltage installation.
Sewage Plant at Villamalea and Casas Ibáñez (Albacete).
Construction and operation for 8 year. The sewage facilities are of the active-sludge biological treatment type, with prolonged aeration, sized for a daily wastewater volume of between 1.700 and 1.500 m3.
Tideway Channelling at Valdearenas Cliff and its Tributaries in Calatayud (Zaragoza).
The most relevant figures are 80.000 m3 of excavation work, 40.000 kg of iron reinforcement, 1.100 m2 of screening wall and 1.000 m3 of stone filling.
Use of the Outflow from the Sewage Plant at Puerto de Santa Maria (Cádiz).
Recovery and improvement of the riverside landscape at L'Estany Menor (Mallorca).
Aznalcóllar spill sludge pick up (Sevilla).