Interesting works recently completed or under construction:

Mediterranean Expressway. Highway N-340, from Cadiz and Gibraltar to Barcelona. Section Almuñécar (La Herradura)-Almuñécar (Taramay). 9,12 km in length with 3 tunnels of 2.030, 278 and 220 meters in length, 4 viaducts, 5 overpasses and 3 underpasses. The most relevant figures are 4,3 and 4,18 million m3 of excavation and earth filling and 127.701 m3 of selected ground.

Expressway Levante-Aragón-Somport. Section Castellón-Teruel and Sarrión Junction. 18,24 km in length with 3 viaducts, one on the Albentosa river of 620 meters in length and 60 meters of height and another 2 viaducts, on the highway Mora de Rubielos and the Barranco de los Judíos, both of 264 meters in length and 25 meters of height.

A-381 expressway from Jerez de la Frontera to Los Barrios. Section V. 16,542 km in length, with 13 viaducts, 6 underpasses and 14 frames. The most relevant figures are 2,7 and 1,7 million m3 of excavation and earth filling lime stabilized, 105.000 m3 of concrete and 217.284 Tn of asphalt mixtures.

Expressway Sevilla-Huelva-Ayamonte. Section San Juan del Puerto-Aljaraque Junction. Involving a double braced arch bridge over the Odiel River which has two 152 m spans, 29 m width. Another structures are 1 viaduct, 6 road links with its respective structures, 16 underpasses, 9 overpasses and 19 frames. The most relevant figures are 3 million m3 of excavation, 4,7 million m3 of earth filling, 380.000 Tn of asphalt mixtures 85.000 m3 of concrete and 2.900 m of prefabricated beams.

Logroño By-pass, Section Southern and Piqueras Junction. 6,2 km in length with a bridge over Iregüa's river with 304 m in length and 24,7 m of width. The most relevant figures are 752.314 and 421.652 m3 of excavation and earth filling, 5.551 Tn of reinforcement steel, 221.000 m3 of concrete and 145.000 Tn of asphalt mixtures.

Expressway Sevilla-Granada-Almería. Section Nacimiento - CN-340 intersection. 24 km in length, contains 3 viaducts and 2 bridges, 3 underpasses and 5 overpasses. The most relevant figures are 5,6 million m3 of excavation and 4,9 million m3 of earth filling, 351.000 Tn of asphalt mixtures and 28.000 m3 of concrete.

Militar base and Cerromuriano district By-pass CN-432 Badajoz-Granada. Section El Vacar-Córdoba. 12,2 km in length, 9 frames, 5 structures and 2.200 m2 of structures deck. The most relevant figures are 2,6 and 2 million m3 of excavation and earth filling, 138.100 m3 of selected fillings and 99.500 Tn of asphalt mixtures.

N-225 from Teruel to Grao de Castellón. Section El Juncar-Moncófar. Upgrade and improve the road route 19,4 km in length. The most relevant figures are 1,1 and 1 million m3 of excavation and earth filling, 165.000 m3 of selected fillings, 125.000 Tn of asphalt mixtures, 1.505 Tn of reinforcement steel and 18.500 m3 of concrete in structures.

Maintenance and operation of the A-62 Expressway. (Valladolid).

Operations of maintenance on the A-92 Expressway. PK 14+000 to the PK 127+200.