The building is located on a plot of 3,364 m2 and has 6 floors on a gradient in the form of an “L” and two floors low gradient for car parks. The building is to be constructed using a modular metal structure and the standardisation of elements to help reduce waste generation.
Construction of the Nursery and Primary Education Centre (CEIP) in Moguent de la Roca del Vallés and extension and reform work on the “Teresa Miquel y Pamies” and “Alberich y Casas” CEIPs.
Building with a built surface of 6,290 m2 with three different blocks: a block housing installations, another for surgery and operating theatre, and a last block for the emergency department.
Construction of Public secondary school in Yuncos.
Real-estate project which is being developed in the surrounding area of the new ADIF station in Málaga. The building has 8 floors, on which there are 352 housing units, including two and three bedroom apartments, commercial spaces and an interior space destined for a large area with gardens, an area for leisure activities, children’s play area and swimming pools.
The building consists of four underground floors, to be used as garages and storerooms, a ground level for commercial premises, a mezzanine area and 221 houses distributed over nine floors (8 floors plus the penthouse).
Execution of the urban infrastructure including lighting, water, the drainage system, pavements, road paving and construction of 92 single-family houses.
The residential complex is located in the Retamar (Almería). 145 residential units arranged in two rows of 3 three-storey blocks and 3 floors. There is a common green space with a swimming pool and dressing-rooms, and it has an underground car park for 145 cars.
Construction of 396 houses, garages, commercial spaces and swimming pools. The Residential Complex consisting of 5 six-storey blocks with a mixed exposed brick and pebble dash facade.
The land has a total surface area of 307,239 m2. The aim of the development is to provide estates that are integrated on both sectors with a sewage system, drinking water supply, electricity distribution network, street lighting, telephone network and gardens and parks.
Development of the UE-14, UE-15 and UE-17 sectors, occupied by industrial use buildings. The main work is as follows: carrying out of roads, pavements and car parks, construction of drinking water, drainage and rainwater networks, communications network, electricity, street lighting, regulation of traffic, gardening and irrigation of green areas.
Development of the south section of the Unit Execution 5-UE.9.
Supply of drinking water with the installation of 1 pumping station, electricity, gas system, telephone lines, and pulic lighting, pavements and green zones.
The most relevant figures are 18,091 m2 of road, 2,535 m² of car park, 16,684 m2 of pavement and 8,269 m2 of green space.
Development of houses on consolidated land with the installation of a sewage system, electricity supply with 5 transformation centres, gas supply, telephone system and public street lighting.
The most relevant figures are 350,000 m3 of excavation and 175,000 m3 of earth filling, 6,500 m3 of concrete, 6,500 m of cast iron piping, 11,300 concrete pipes, 14,100 m of channelling, 10,400 Tn of asphalt mixtures and 7 transformation centres.
Underground car park with 510 spaces on three floors below ground level and reorganisation of traffic in the surrounding area as a result of the new entrance and exit of traffic around the car park area and external development.
Construction and operation of public car park and centre for documentation. The car park is an underground building with 2 floors under ground level and a built surface area of 17,120 m2 and it has capacity for 678 parking spaces. The most relevant figures are 70,000 m3 of excavation, 1,300,000 kg of steel, 13,700 m3 of concrete and 8,800 m2 landscaped roof.
Construction and operation of the car park in the Plaza Andrés López Yebra, Fuengirola. It has 461 park spaces distributed over 4 floors. Development of the squares, adjacent streets and the reorganisation of traffic in the areas of influence.
Construction and operation of three car parks with a total surface of 40,057 m2, located in Plaza Madre de Dios (434 park spaces and 2 floors), Plaza del Caballo (344 car spaces in 1 floor) and Plaza del Arenal (817 car spaces in 4 floors. Development of the squares, adjacent streets and the reorganisation of traffic in the areas of influence.