The maritime construction project consists of a lock which is 250 m in length, 40 m wide and 15 m deep, the demolition of the present lock and the dredgation of the whole surrounding area in order to facilitate entry to the Port. The project includes the emptied and filled system, the maritime and terrestrial accesses, the buildings of control and offices, machinery, general services (warehouse, workshop and electrical systems) and the parcel development.
Construction of a new breakwater for the new dock and the demolition of part of the existing dam forming part of the new breakwater, new formation for second dam supported on the existing beach jetty located to the south of the port, dredging required for the operational conditions of the new dock and consolidation of the new sea space inside the port as a result of the work carried out to extend the dock.
Extension of the taxiway that runs parallel to the main runway up to the head 02 and execution of a fast way out runway in landings by head 20.
A service road will be constructed too and the replacement of the perimetral way will be carried out, demolishing the current ones. In addition the works will be executed for the new access control in the platform north zone.
Other actions will be the replacement of the waiting point vertical signs, the installation of the new runway protection lights and semaphores, the new platform horizontal signs and the construction of a pedestrian plant-lined path to continue the one that already exists.
Construction of an aircraft apron platform (with a surface of 206,287 m2)and a flexible pavement area (98,679 m2) for aircraft in motion within the Southern Terminal in the Barcelona Airport. In addition, a service tunnel has also been constructed to connect with the new Terminal.